{"id":2003,"date":"2023-07-28T17:44:19","date_gmt":"2023-07-28T15:44:19","guid":{"rendered":"https:\/\/petraenergia.pl\/realizacje\/leczyca\/"},"modified":"2024-01-17T11:50:49","modified_gmt":"2024-01-17T10:50:49","slug":"leczyca","status":"publish","type":"realizacja","link":"https:\/\/petraenergia.pl\/en\/realizacje\/leczyca\/","title":{"rendered":"Leczyca &#8211; lighting of footpath"},"content":{"rendered":"\n<p>As part of our next project, we were pleased to erect 16 pieces of hybrid lampposts along with CCTV monitoring.<\/p>\n\n<p><a href=\"https:\/\/petraenergia.pl\/sztandarowe-realizacje-leczyca-galeria\/\" title=\"https:\/\/petraenergia.pl\/sztandarowe-realizacje-leczyca-galeria\/\">See more on the blog&#8230;<\/a><br\/><br\/><\/p>\n\n<h1 class=\"wp-block-heading\"><strong>Solar lanterns with CCTV monitoring<\/strong><\/h1>\n\n<p><br\/><\/p>\n\n<h2 class=\"wp-block-heading\"><br\/><strong>Project background:<\/strong><\/h2>\n\n<p>The project included the design and installation of pedestrian path lighting along with CCTV monitoring at the revitalized lagoon in Leczyca. The essence of the project was that the whole thing, both the lighting and the cameras, would work all year round without interruption, solely through energy obtained  <br\/>From Renewable Energy Sources i.e. wind and solar.<\/p>\n\n<p><\/p>\n\n<h2 class=\"wp-block-heading\"><br\/><strong>How it was implemented:<\/strong><\/h2>\n\n<p>The monitoring system at the lagoon was built on solar lanterns and integrated with the lantern power supply. It consists of 8 cameras, and each camera is equipped with a communication device to transmit video over the LTE network. In this case, the image is sent to the Municipal Police Department  <br\/>in Leczyca. It is worth noting that each lighthouse is connected to a router equipped with a SIM card, with a fixed IP address. And the routers themselves are equipped with directional antennas to transmit the signal to the telecom operator. The drive that collects information is equipped with a 6TB memory.<\/p>\n\n<p>Cameras have been set up along the path by the city lagoon, on the above-mentioned lampposts, so that the path can be monitored along its entire length.<\/p>\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:66.66%\">\n<figure class=\"wp-block-table\"><table><tbody><tr><td>LED luminaire<\/td><td>50 W<\/td><\/tr><tr><td>Color temperature<\/td><td>6500 K<\/td><\/tr><tr><td>Luminous flux<\/td><td>&gt;6250 lm<\/td><\/tr><tr><td>Lifespan of the luminaire<\/td><td>over 50,000 h<\/td><\/tr><tr><td>Modu\u0142 fotowoltaiczny monokrystaliczny<\/td><td>380 W<\/td><\/tr><tr><td>Column height<\/td><td>8 m<\/td><\/tr><tr><td>Luminaire at height<\/td><td>6 m<\/td><\/tr><tr><td>Turbine mounting height<\/td><td>8,2 m<\/td><\/tr><tr><td>Gel battery<\/td><td>2 x 150 Ah<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ul class=\"wp-block-list\"><li>Possibility to set 5 working periods with different lamp brightness levels<\/li><li>Automatically adjusting for the length of the night<\/li><li>Programming of all controller parameters (lamp operating times, light intensity, battery threshold voltages, light intensity at which the lamp is to switch on)<\/li><li>Full waterproofing<\/li><li>Maximum power point tracking (MPPT)<\/li><\/ul>\n\n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:33.33%\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"658\" height=\"1600\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-658x1600.jpg\" alt=\"Solar lantern with CCTV monitoring\" class=\"wp-image-1390\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-658x1600.jpg 658w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-421x1024.jpg 421w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-768x1868.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-842x2048.jpg 842w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-latarniacctv-scaled.jpg 1052w\" sizes=\"(max-width: 658px) 100vw, 658px\" \/><\/figure>\n\n\n\n<p>warranty period: 24 months<\/p>\n\n\n\n<p>energy reserve: 33 hours<\/p>\n<\/div>\n<\/div>\n\n<div class=\"components\">\n  <div class=\"components__head\" data-toggle=\"collapse\" data-target=\"#block_e231c8f85516da26d216028125a28dcc\">\n    <h2>\n      Komponenty    <\/h2>\n\n    <small>\n      See more<i class=\"icon icon-pe-arrow-circle\"><\/i>\n    <\/small>\n  <\/div>\n\n\n  <div class=\"components__body\" id=\"block_e231c8f85516da26d216028125a28dcc\">\n    <ul class=\"list list--components\">\n\n      <li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"360\" height=\"360\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail portrait\" alt=\"\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-kamara-cctv-360x360.jpg\" \/><\/div><div><p>IP 4MPX tube camera<br \/>\nwhite 2.8mm MicroSD<br \/>\nDeepLearning MIC IR30<br \/>\nUNIVIEW<br \/>\n1 pc. included<\/p>\n<\/div><\/li><li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"360\" height=\"360\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail portrait\" alt=\"\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250-360x360.jpg 360w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250-768x768.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250.jpg 800w\" sizes=\"(max-width: 360px) 100vw, 360px\" data-srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250-360x360.jpg 360w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250-768x768.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250.jpg 800w\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/04\/petraenergia-jablonka-solar-panel-250-wp-scl250-360x360.jpg\" \/><\/div><div><p>Photovoltaic module<br \/>\npolycrystalline<br \/>\nEcoDelta ECO-280P<br \/>\n2 pcs. included<\/p>\n<\/div><\/li><li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"360\" height=\"360\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail portrait\" alt=\"\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-petra-541-2x16-c740-360x360.jpg\" \/><\/div><div><p>Petra 50 W LED luminaire<br \/>\n1 pc. included<\/p>\n<\/div><\/li><li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"119\" height=\"123\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail portrait\" alt=\"\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-kontroler.png\" \/><\/div><div><p>MPPT controller<br \/>\nREMOTE POWER<br \/>\n1 pc. included<\/p>\n<\/div><\/li><li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"360\" height=\"360\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail landscape\" alt=\"\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-akumulator-zelowy-150-ah-360x360.png\" \/><\/div><div><p>Gel battery<br \/>\n150 Ah<br \/>\n2 pcs. included<\/p>\n<\/div><\/li><li class=\"list__item\"><div class=\"list__image\"><img decoding=\"async\" width=\"174\" height=\"107\" src=\"data:image\/png;base64,iVBORw0KGgoAAAANSUhEUgAAAAEAAAABCAQAAAC1HAwCAAAAC0lEQVR42mP8Xw8AAoMBgDTD2qgAAAAASUVORK5CYII=\" class=\"attachment-thumbnail size-thumbnail landscape\" alt=\"\" data-src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/06\/petraenergia-leczyca-pilot-do-kontrolera.png\" \/><\/div><div><p>Remote control for controller<br \/>\n1 pc. included<\/p>\n<\/div><\/li>\n    <\/ul>\n  <\/div>\n\n<\/div>\n\n<h2 class=\"wp-block-heading\">Gallery<\/h2>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"1065\" data-id=\"1522\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-1600x1065.jpg\" alt=\"\" class=\"wp-image-1522\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-1600x1065.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-1024x681.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-768x511.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-1536x1022.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-012-2048x1363.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"900\" data-id=\"1524\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-1600x900.jpg\" alt=\"\" class=\"wp-image-1524\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-1600x900.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-1024x576.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-768x432.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-1536x864.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-017-2048x1152.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"900\" data-id=\"1526\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-1600x900.jpg\" alt=\"\" class=\"wp-image-1526\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-1600x900.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-1024x576.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-768x432.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-1536x864.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-018-2048x1152.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"900\" data-id=\"1528\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-1600x900.jpg\" alt=\"\" class=\"wp-image-1528\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-1600x900.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-1024x576.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-768x432.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-1536x864.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-024-2048x1152.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"1065\" data-id=\"1530\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-1600x1065.jpg\" alt=\"\" class=\"wp-image-1530\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-1600x1065.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-1024x681.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-768x511.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-1536x1022.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-026-2048x1363.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-scaled.jpg\"><img decoding=\"async\" width=\"1600\" height=\"900\" data-id=\"1534\" src=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-1600x900.jpg\" alt=\"\" class=\"wp-image-1534\" srcset=\"https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-1600x900.jpg 1600w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-1024x576.jpg 1024w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-768x432.jpg 768w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-1536x864.jpg 1536w, https:\/\/petraenergia.pl\/wp-content\/uploads\/2021\/07\/petraenergia-leczyca-l-029-2048x1152.jpg 2048w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/a><\/figure>\n<\/figure>\n\n<p><\/p>\n","protected":false},"featured_media":1516,"template":"","product_type":[30],"location":[24],"class_list":["post-2003","realizacja","type-realizacja","status-publish","has-post-thumbnail","hentry","product_type-cctv-monitoring","location-green-areas"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/realizacja\/2003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/realizacja"}],"about":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/types\/realizacja"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/media\/1516"}],"wp:attachment":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/media?parent=2003"}],"wp:term":[{"taxonomy":"product_type","embeddable":true,"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/product_type?post=2003"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/location?post=2003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}