{"id":2446,"date":"2024-01-17T11:44:12","date_gmt":"2024-01-17T10:44:12","guid":{"rendered":"https:\/\/petraenergia.pl\/realizacje\/dobrzyn-nad-wisla-road-lighting-2\/"},"modified":"2024-01-17T11:44:12","modified_gmt":"2024-01-17T10:44:12","slug":"dobrzyn-nad-wisla-road-lighting-2","status":"publish","type":"realizacja","link":"https:\/\/petraenergia.pl\/en\/realizacje\/dobrzyn-nad-wisla-road-lighting-2\/","title":{"rendered":"Dobrzy\u0144 nad Wis\u0142\u0105 &#8211; Road lighting"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Solar lanterns <\/h2>\n\n<p>Our next <a href=\"https:\/\/petraenergia.pl\/en\/our-projects\/\" title=\"\">realization<\/a> was the lighting of public roads in <a href=\"https:\/\/www.dobrzyn.pl\" title=\"\">Dobrzy\u0144 nad Wis\u0142\u0105.<\/a> The realization included the replacement of old lighting with new more energy-efficient lighting. <\/p>\n\n<h2 class=\"wp-block-heading\"><br\/><\/h2>\n\n<h2 class=\"wp-block-heading\"><strong>How it was implemented: <\/strong><\/h2>\n\n<p>The investment amounted to the installation of 20 lighting lamps. The lamps were located along the road, and we used solar lamps with a photovoltaic module. They save energy at times when lighting is not needed. <\/p>\n\n<p><\/p>\n\n<p><\/p>\n\n<p><\/p>\n\n<p><\/p>\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>LED luminaire<\/td><td>30 W<\/td><\/tr><tr><td>Color temperature<\/td><td>4000 K<\/td><\/tr><tr><td>Luminous flux<\/td><td>3600 lm<\/td><\/tr><tr><td>Lamp life<\/td><td>over 50,000 h<\/td><\/tr><tr><td>Pole height<\/td><td>6 m<\/td><\/tr><tr><td>polycrystalline photovoltaic module<\/td><td>1 x 200 W<\/td><\/tr><tr><td>Luminaire at height<\/td><td>5,5 m<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"featured_media":0,"template":"","product_type":[22],"location":[27],"class_list":["post-2446","realizacja","type-realizacja","status-publish","hentry","product_type-solar-hybrid-lamps","location-roads"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/realizacja\/2446","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/realizacja"}],"about":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/types\/realizacja"}],"wp:attachment":[{"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/media?parent=2446"}],"wp:term":[{"taxonomy":"product_type","embeddable":true,"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/product_type?post=2446"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/petraenergia.pl\/en\/wp-json\/wp\/v2\/location?post=2446"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}