9880 Wp terrestrial installation in the village of Dzielec. It supplies energy to a single-family house heated by a 15 kW electrode boiler. With semi-annual billing of energy consumed and consumed (known as netmettering), the owner covers the cost of electricity consumed at home from his own photovoltaic installation.

Installation configuration:

  • Modules: WINAICO 38 pcs, 260 Wp, polycrystalline
  • Inverters: Samil Power 10 kW power
  • Scope of work: Design, delivery, installation and commissioning of the plant

Komponenty

See more
  • 38 modules
    polycrystalline 260 Wp

  • Samil Power Inverter
    SolarLake 10000TL-PM
    rated AC power 10000 W

  • PV switchgear
    compliant
    PROSUMENT program


Back to all

Gmina Ciechanów, Polska

133 solar lanterns and 3 JUWENTA-1 hybrid lanterns – lighting roads and sidewalks in the Ciechanow Municipality.

Renewable Energy Fair Enex Kielce 2025

Gmina Wąsosz, Polska

Municipality of Wąsosz – Lighting of pedestrian crossing

Gmina Giby, Polska

Giby commune – Infrastructure lighting

Gmina Płaska, Polska

Plaska Municipality – Road lighting