Hybrid installation 3640 Wp

Petra Energia/PV instaliations/Hybrid installation 3640 Wp

The off-grid photovoltaic installation was made in a single-family house. Thanks to the use of batteries and hybrid inverter, the installation significantly increases the use of energy from the sun, in addition, during periods of failure of the industrial grid, it provides electricity independently giving the owner full independence.

Installation configuration:

  • Modules: 14 pcs, 260 Wp, polycrystalline
  • Inverters: IMEON 3.6 kW
  • Batteries: Gel 100 Ah 8 pcs.
  • Scope of work: Design, delivery, installation and commissioning of the plant