Zolwin – hybrid installation

Petra Energia/PV instaliations/Zolwin – hybrid installation

Hybrid installation 3200 Wp east-west on a garage at a single-family house. Thanks to the use of batteries and hybrid inverter, the installation significantly increases the use of energy from the sun, in addition, during periods of failure of the industrial grid, it provides electricity independently giving the owner full independence.

Read more about Installation…

Installation configuration:

  • Modules: ZNShine 16 pcs, 200 Wp, monocrystalline
  • Inverters: IMEON 3.6
  • Batteries: gel 200 Ah 4 pcs.
  • Scope of work: Design, delivery, installation and commissioning of the plant

Komponenty

See more
  • 16 200 Wp monocrystalline modules

  • DC PV surface-mounted switchgear

  • AC PV surface-mounted switchgear

  • Imeon 3.6 hybrid inverter

  • Surface-mounted battery switchgear

  • 4 200 Ah gel batteries

Gallery


Back to all

Gmina Ciechanów, Polska

133 solar lanterns and 3 JUWENTA-1 hybrid lanterns – lighting roads and sidewalks in the Ciechanow Municipality.

Renewable Energy Fair Enex Kielce 2025

Gmina Wąsosz, Polska

Municipality of Wąsosz – Lighting of pedestrian crossing

Gmina Giby, Polska

Giby commune – Infrastructure lighting

Gmina Płaska, Polska

Plaska Municipality – Road lighting